HRT
The electrical installation progressed from a shell and core phase to a complete CAT B fit-out, prioritising a fully functional, safe, and efficient electrical infrastructure customised to meet the tenant’s specific requirements. This fit-out optimised the space by providing reliable power distribution, lighting controls, and lighting systems, all designed and installed in strict compliance with current BS standards and IET regulations.
Throughout the installation process, careful coordination ensured alignment with the construction schedule, minimising disruption across all areas and consistently upholding health and safety standards.








